|
|
||||||||||||||||||||||
![]() |
|
|||||||||||||||||||||
|
INFORMATION
|
|
|||||||||||||||||||||
|
|
||||||||||||||||||||||
|
MUCH MORE THAN
AIR COMPRESSORS!® |
|
|||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
|
||||||||||||||||||||||
|
LOCATIONS
|
|
|||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PAVING BREAKERS | ||
|---|---|---|
| 35 LB CLASS | 30-40 | CFM |
| 60 LB CLASS | 50-60 | CFM |
| 90 LB CLASS | 70-80 | CFM |
| ROCK DRILLS | ||
| 25 LB CLASS | 30-50 | CFM |
| 35 LB CLASS | 55-75 | CFM |
| 45 LB CLASS | 80-100 | CFM |
| 75 LB CLASS | 150-175 | CFM |
| Details Click Here …. | ||
| CHIPPING HAMMERS | ||
| LIGHT DUTY | 15-25 | CFM |
| HEAVY DUTY | 25-30 | CFM |
| SUMP PUMPS | ||
| 10 ft - 40 ft HEAD | 80-90 | CFM |
| 100 ft - 150 ft HEAD | 150-180 | CFM |
| RIVETING HAMMERS | ||
| 15-18 LB (5/8" - 3/4" DIA.) | 25-35 | CFM |
| 20-25 LB (7/8" - 1 1/4"DIA.) | 35-45 | CFM |
| IMPACT WRENCHES | ||
| 8-12 LB (5/8" BOLT) | 15-20 | CFM |
| 15-20 LB (3/4" BOLT) | 30-40 | CFM |
| CONCRETE VIBRATORS | ||
| 2 1/2" DIA. TUBE | 20-30 | CFM |
| 3" DIA. TUBE | 40-50 | CFM |
| 4" DIA. TUBE | 45-55 | CFM |
|
|||||||
|---|---|---|---|---|---|---|---|
HOW MUCH HEAT DO I REQUIRE? | |||||||
EASY SIZING CHART |
|||||||
Cubic feet of space to be heated**
|
Temperature Rise Required (degrees F)* |
BTU Capacity Required
|
* Temperature rise required is the difference between actual temperature and desired temperature. | ||||
20 degrees |
30 degrees |
40 degrees |
50 degrees |
||||
5,000 |
14,000 |
20,000 |
27,000 |
34,000 |
** To determine cubic footage: Length x Width x Height of structure. |
||
7,000 |
19,000 |
28,000 |
38,000 |
47,000 |
|||
10,000 |
27,000 |
40,000 |
54,000 |
67,000 |
Notes: Use this size/selection chart as a guide only since buildings vary according to type of construction, tightness and insulation. When BTU requirements are less than 75% of heater's rated capacity optional remote thermostat is recommended for better efficiency. | ||
15,000 |
40,000 |
60,000 |
80,000 |
100,000 |
|||
20,000 |
54,000 |
80,000 |
107,000 |
133,000 |
|||
30,000 |
80,000 |
120,000 |
160,000 |
200,000 |
|||
50,000 |
133,000 |
200,000 |
266,000 |
333,000 |
|||
>> Vaporization Rate and Max BTU Output Click Here ... |
|||||||
>> Guide to Select the Right Size Heater for Construction Heating Click here ... |
|||||||
|
Conversion Tools |
|
Weight |